空調溫度閥組裝

20163315837

此設備是為自動安裝檢測汽車空調溫控閥的閥芯組件而開發的。  

閥芯組件的組成:閥芯座,彈簧,O型圈,閥帽  

設備描述:

此設備為轉盤式結構,共分為16個工位  

1.           Screw  Loading.

1.1.         Vibrator bowl with buffer will be used for screw loading.

1.2.         At least 500 pieces of screw can be loaded at one time.

1.3.         Vibrator bowl will vibrate out screw one by one to linear track.  

1.4.         Pickup head will pick up the screw one at a time and place onto rotary  table.

 

2.          Screw Presence Check

2.1.         Keyence/Omron Presence sensor is used to detect the presence of screw on  the jig.

 

3.           OD Cleaning / Blowing

3.1.          Attached  structure with blower/vacuum system connected to OD position to clean possible  particle on Screw.

 

4.           ID Cleaning / Blowing

4.1.          Attached  structure with blower/vacuum system connected to ID position to clean possible  particle on Screw.

 

5.           O-Ring Loading

5.1.         Vibrator bowl with buffer will be used for O-ring loading.

5.2.         At least 500 pieces of O-ring can be loaded at one time.

5.3.         Vibrator bowl will vibrate out O-ring one by one to linear track.  

5.4.         Pickup head module will pick up the O-ring.

5.5.         Pickup head will have special design jaw that will insert the O-ring to  the screw.

 

 

6.           O-Ring Presence and size

6.1.          Keyence/Omron Presence  sensor is used to detect the presence of O-ring on the screw.

6.1.1.      Size of O-ring  must be controlled

 

   

7.         Screw   Oiling station

 

8.           Spring Loading

 

8.1.         Vibrator bowl with buffer will be used for spring loading.

8.2.         At least 500 pieces of spring can be loaded at one time.

8.3.         Vibrator bowl will vibrate out spring one by one to linear track.  

8.4.         Pickup head will pick-up spring and place inside the screw

 

9.           Spring Force Check & Presence

9.1.         Force sensor will be used for checking spring force.

9.2.          At the  same time, signals are programmed to determine the presence of spring on  screw.

9.3.         Force sensor is installed on structure able to move up down  position.

 

10.        Spring  Oiling station

 

 

 

11.        Ball Valve Loading

 

11.1.               Vibrator bowl with buffer will be used for ball valve loading.  

 

11.2.               At least 500 pieces of ball valve can be loaded at one time.

 

11.3.                Vibrator bowl will vibrate out ball valve one by one to linear  track.

 

11.4.            Two  vibrators bowls is used at this station. The additional bowl is as below  illustrations including bowl, track and vibrator which whole set can be easily  change by removing 4 screws from the base.


The  machine will consist of:  

 

1 bowl  for adjusting screws

1 bowl r  for the O-rings

1 bowl  for the springs

2  interchangeable bowls set for the ball valves

 

It  include the bowl, track and vibrator

Which  whole set can be easily change by removing 4 screws from the base.  

 

 

 

11.5.                Pickup  head will pick-up ball valve and place on top of spring.

11.6.                Special tool head will be used to press ball valve.

 

 

12.        CCD  Checking

 

12.1.               Cognex vision camera is used to check the ball valve.

12.2.                The  vision camera is installed horizontal to perform checking from sideway of the  part.

12.3.             These  camera also double checks that we choose the correct ball size

 

 

13.        Spare Station

13.1.        Spare station is assign for  future usage.

 

 

 

14.        Good & Bad Part Unloading

 

14.1.        Complete part will be  unloaded by a Pick & Place Arm into an aluminum tray.

14.2.        Tray is built with capacity  to load 136 pcs completed part (according to drawing). The machine has to  fill at least 4 trays before it stops.

14.3.        Bad part is drop to bad part  unloading bin flowing to a box beneath of machine.

 

15.        Empty Jig Check

 

15.1.          Presence sensor is used to  check and assure the jig module is empty before moved to first station.  

 

16.    Spare  Station


主站蜘蛛池模板: 国产视频久| 最近中文字幕版免费| 非洲精品性hd| 2020国产免费久久精品99| 国产一区曰韩二区欧美三区| 俄罗斯人与动物xxxx| 52精品免费视频国产专区| 黄色网址视频在线播放| 国产高清一级在线观看| 99国产在线视频| 一本久道久久综合婷婷| 狠狠夜夜| 国产视频a区| 岛国片在线观看| fc2共享免费视频播放| 中文字幕不卡在线播放| 禁网站在线观看免费视频| 国产麻豆91在线| 不卡一区二区在线| 456极品嫩模在线视频| 亚洲无线一二三四区手机| 黄片毛片一级| 国产一区二区免费播放| 国产精品一区二区国产| 国产高清国内精品福利色噜噜 | 999久久66久6只有精品| 亚洲综合第一页| 亚洲精品美女久久久久99| 河马的秘密河文轩冰草莓| 国产伦精品一区二区三区精品| 操操干| 99精品国产综合久久久久五月天| 中文字幕在线观看第一页| 夜夜爽影院| 亚洲夜| 一区二区国产在线观看| 亚洲一区二区三区久久精品| 亚洲宅男天堂a在线| 亚洲天堂福利| 在线不卡一区二区三区日韩 | 99久热成人精品视频|